A Tantalizing Preview of the Crenshaw/LAX Line

The $2-billion Crenshaw/LAX Transit Project is scheduled for completion in 2019 but, thanks to students at Los Angeles Trade Tech College, we can catch a glimpse right now of what’s to come.

Working with the Los Angeles County Metropolitan Transportation Authority, LATTC students created a video simulating a bird’s eye view of the 8.5-mile light rail line that will travel between South Los Angeles and Los Angeles International Airport.

Construction is more than halfway complete. The project will serve passengers in the Crenshaw District, Leimert Park, Inglewood, Westchester, El Segundo, and points in between. There will be eight stations, with the northernmost connecting to the Expo Line and the southernmost to the Green Line.

The project is expected to have a daily ridership of 13,000 to 16,000, and would be the first to serve the area since streetcars – dubbed “Yellow Cars” – stopped running in the 1950’s. It is funded through a loan from the federal government and Measure R, a half-cent transit sales tax approved by voters in 2008.

Crenshaw-LAX Aviation-Century